Data Center Energy Consumption (2020–2035)

Data centers used 485 TWh of electricity in 2025, more than France, and the IEA expects that to roughly double by 2030 as AI servers spread. The Overtake Line tracks the world's data centers as they pass whole countries' power use, one by one.

Updated Nov 11, 20268 charts · 4 key stats14 primary sources
Fig. 1

The Overtake Line

Data center electricity consumption worldwide, 2020–2035, TWh, against each country's total electricity demand in 2025. A diamond marks where data centers pass a country; the label gives the first IEA year at or above it. Solid line: IEA estimates; dashed: IEA Base Case projection.

Data centers, IEA estimateIEA Base Case projectionCountry demand, 2025Passes a level
03006009001,200202020232024202520302035Russia1,178 TWhpassed by 2035Japan1,027 TWhpassed by 2035Brazil775 TWhpassed by 2030Canada654 TWhpassed by 2030Germany517 TWhpassed by 2030France481 TWhpassed by 2025United Kingdom312 TWhpassed by 2023269 TWh2035: 1,193 TWh

Data centers: IEA, excluding cryptocurrency mining; 2020 from the 2025 report, 2023–2035 from the 2026 update, which publishes no years in between (segments are straight lines). Countries: Ember 2025 demand (generation plus net imports, including grid losses), held at 2025 levels. Russia is passed by a narrow margin (1,193 vs. 1,178 TWh).

Data center electricity use worldwide, 2025
485 TWh
Up more than 15% in a year, slightly more than 1.5% of the world's electricity
Share of Ireland's metered electricity used by data centers, 2025
23%
Up from 5% in 2015; 7,663 GWh in 2025
Water estimated to have been used to train GPT-3
5.4M liters
In Microsoft's U.S. data centers, including 700,000 liters evaporated on site (peer-reviewed estimate)
Energy per median Gemini text prompt, May 2025
0.24 Wh
33× less than a year earlier; 0.26 mL of water per prompt (Google's own measurement)
Fig. 2

The U.S. uses 46% of the world's data center electricity

Data center electricity consumption by region, 2025, TWh

46.2%24.1%14.8%14.8%
  • United States224 TWh46.2%
  • China117 TWh24.1%
  • Europe72 TWh14.8%
  • Rest of world72 TWh14.8%
  • World485 TWh100%

Rest of world is derived by data.co: the IEA world total minus the three regions shown.

Fig. 3

Even the IEA's lowest case nearly doubles demand by 2035

Data center electricity consumption by IEA scenario, worldwide, 2035 vs. the 2025 estimate, TWh

Lift-Off1,637 TWhBase Case1,193 TWhHigh Efficiency1,013 TWhHeadwinds942 TWh2025 estimate485 TWh

IEA 2026 update (Table A.1). Scenario assumptions are set out in the IEA report; the IEA calls its projections to 2035 exploratory.

Fig. 4

Google's electricity use has more than tripled since 2019

Big tech electricity consumption by company, TWh per year, all operations

010203040502019202020212022202320242025Google43.6 TWh in 2025Microsoft37 TWh in 2025Meta18.4 TWh in 2024

Company-reported. Google 2021–2025 from its 2026 report, 2020 from its 2025 report and 2019 from its 2024 report (Google restates past years). Microsoft fiscal years end June 30 (FY25 plotted at 2025). Meta has not yet published 2025 data.

Fig. 5

The two main global estimates differ by about 300 TWh

Global data center electricity consumption estimates by year, TWh

0300600900202020212022202320242025S&P Global787.8 TWh in 2025IEA485 TWh in 2025

S&P Global models installed data center capacity in 47 countries times assumed utilization and cooling overhead; the IEA builds up from server shipments and power draw and excludes crypto mining. Our World in Data attributes much of the gap to crypto mining. IEA publishes only the years shown.

Fig. 6

U.S. data centers could use nearly 12% of U.S. power by 2030

U.S. data center share of U.S. electricity consumption, estimates and 2030 scenarios, %

20181.9%20234.4%20244.7%2030, low case9.5%2030, reference case11.8%2030, high case15.3%

LBNL. 2018 and 2023 from the December 2024 report; 2024 and 2030 from the June 2026 update, which implies a lower 2023 figure. 2030 values are scenarios (521 to 843 TWh; reference case 649 TWh).

Fig. 7

Google consumed five times as much water as Microsoft

Big tech water consumption by company, latest reported year, liters

Google (2025)41.1B LMicrosoft (FY2025)8.2B LMeta (2024)3.1B L

Water consumed (withdrawn minus returned), all operations. Google: 2025, converted by data.co from 10,869 million gallons (Google rounds it to 41 billion liters). Microsoft: fiscal year to June 2025. Meta: 2024. Amazon reports only data center withdrawals (9.4 billion liters in 2025), so it is not comparable.

Fig. 8

Data centers now use 23% of Ireland's electricity

Data center share of Ireland's metered electricity consumption, 2015–2025, %

010%20%30%20152017201920212023202523%5%

Metered consumption by customers the CSO identifies as data centers; shares are as published (whole percent).

Free to republish

Add This Graphic to Your Website

Paste one snippet and every chart, stat and citation above appears on your page. It stays interactive and responsive, and it updates automatically when we revise the data.

  • All sources travel with every card
  • Resizes to fit any column width
  • Light or dark theme, full set or a single card
  • Free with attribution, which is built in
Share this graphic
<div class="graphic-embed" data-graphic="data-center-energy-consumption">
  <a href="https://data.co/graphics/data-center-energy-consumption">Data Center Energy Consumption (2020–2035)</a> by Data.co
</div>
<script async src="https://data.co/embed.js"></script>
Auto-resizes to fit its content. Works on WordPress, Webflow, Squarespace, Ghost and plain HTML.
Preview

How much electricity do data centers use?

Data centers worldwide used about 485 terawatt-hours (TWh) of electricity in 2025, according to the International Energy Agency's April 2026 update, up more than 15% from 416 TWh in 2024. That is slightly more than 1.5% of the world's electricity and, on Ember's 2025 country figures, a little more than all of France (481 TWh). In 2020 the IEA put data center use at 269 TWh.

Figure 1, the Overtake Line, plots that series against whole countries' electricity demand. Data centers passed the United Kingdom (312 TWh) by 2023 and France by 2025. On the IEA's Base Case they pass Germany, Canada and Brazil by 2030 and Japan (1,027 TWh) and Russia (1,178 TWh) by 2035.

How much energy will AI data centers use by 2030?

About 945 TWh in the IEA's Base Case, roughly double the 2025 level and close to 3% of global electricity. The IEA expects electricity use by AI-focused data centers to more than triple by 2030, to about 465 TWh. By 2035 its Base Case reaches 1,193 TWh.

The range is wide (Figure 3). For 2035 the IEA's scenarios run from 942 TWh in its Headwinds case to 1,637 TWh in its Lift-Off case. Even the low case is 1.9 times the 2025 level.

Which country uses the most data center electricity?

The United States, at 224 TWh in 2025, or 46% of the world total (Figure 2). China used 117 TWh and Europe 72 TWh. In 2024, the IEA put U.S. data center use at about 540 kWh per person, against about 70 kWh in China, and expects U.S. data centers to account for nearly half of U.S. electricity demand growth to 2030.

Lawrence Berkeley National Laboratory's U.S. estimates are higher than the IEA's (154 TWh for 2023 and 183 TWh for 2024). Its 2024 report put U.S. data centers at 176 TWh in 2023, 4.4% of U.S. electricity, and projected 325 to 580 TWh by 2028. Its June 2026 update puts 2024 at 192 TWh (4.7%) and 2030 at 521 to 843 TWh, or 9.5% to 15.3% of U.S. electricity, with 649 TWh (11.8%) in its reference case (Figure 6).

Where do data centers use the largest share of electricity?

Ireland. Data centers used 23% of the country's metered electricity in 2025, up from 5% in 2015, according to the Central Statistics Office (Figure 8). Their consumption rose from 1,240 gigawatt-hours (GWh) in 2015 to 7,663 GWh in 2025, while total metered use rose from 24,600 GWh to 32,986 GWh.

How much electricity do Google, Microsoft and Meta use?

Google used 43.6 TWh in 2025, up 37% in a year and 3.6 times its 2019 use of 12.2 TWh (Figure 4). Microsoft used 37.0 TWh in its fiscal year ended June 2025, up 24%. Meta used 18.4 TWh in 2024, its latest reported year. Almost all of it goes to data centers: 42.4 TWh of Google's 2025 total and 18.1 TWh of Meta's 2024 total.

How much energy does one AI prompt use?

Google measured 0.24 watt-hours (Wh) of energy and 0.26 milliliters of water for the median Gemini Apps text prompt in May 2025, 33 times less energy than a year earlier. Those figures include idle machines, cooling and other data center overhead, but they are the company's own measurement of a median prompt; longer or reasoning-heavy requests use more.

How much water does AI use?

Google consumed 10.9 billion gallons (41 billion liters) of water in 2025, up 34%, and 10.5 billion gallons of that went to its data centers. That is about five times Microsoft's 8.17 billion liters in fiscal 2025 (Figure 7). Lawrence Berkeley National Laboratory estimates that U.S. data centers directly consumed 66 billion liters of water in 2023, up from 21.2 billion liters in 2014.

For individual models, a peer-reviewed study by Li and colleagues estimated that training GPT-3 in Microsoft's U.S. data centers consumed 5.4 million liters of water, including 700,000 liters evaporated on site, and that GPT-3 used a 500 mL bottle of water for roughly 10 to 50 medium-length responses.

Methodology & caveats

Global and regional data center figures are the IEA's. The 2025, 2030 and 2035 values and the scenarios come from Key Questions on Energy and AI (April 2026, Tables A.1 and A.4); the 2020 value comes from Energy and AI (April 2025). The two vintages agree within 1 TWh for 2023 and 2024. The IEA's text rounds some values (415 TWh for 2024, about 950 TWh for 2030); cards use its table values. The IEA excludes cryptocurrency mining. Rest of world in Figure 2 is the world total minus the U.S., China and Europe, calculated by data.co.

Country benchmarks in Figure 1 are Ember's 2025 electricity demand (generation plus net imports), which includes grid losses and is higher than final consumption. They are held at 2025 levels, although countries' demand will also change. Because of the different definitions, the IEA's own comparison (945 TWh in 2030 being slightly more than Japan's consumption) does not hold on Ember's figure for Japan (1,027 TWh), and this graphic does not repeat it. Crossing years are the first IEA year at or above a country's level; the IEA publishes no figures between 2025 and 2030 or between 2030 and 2035, so the dot's position between those years is not an estimate.

Global estimates differ widely (Figure 5). The Energy Institute's Statistical Review of World Energy 2026 publishes S&P Global's series (787.8 TWh in 2025), built bottom-up from installed capacity in 47 countries, assumed utilization and cooling overhead. Our World in Data (secondary) attributes much of the gap with the IEA to crypto mining, which S&P appears to include. The Energy Institute figures were read from a full copy of the report hosted by KPMG because energyinst.org blocked automated access.

Company figures are self-reported and cover all operations, not just AI. Google restates past years; this graphic uses the 2026 report for 2021–2025 and earlier reports for 2019 and 2020. Microsoft reports fiscal years ending June 30 and recalculated its past water figures in its 2026 fact sheet. Meta's 2021 split between data centers and offices appears transposed in its source, so only totals are used. Google's water in liters is converted from gallons by data.co. Per-prompt figures are Google's measurement of one median prompt; other companies' published per-prompt figures use different scopes and methods, so they are not charted. Ireland's shares are the CSO's whole-percent figures.

Sources

  1. [1]
    International Energy Agency. Key Questions on Energy and AI (April 2026): data centre electricity consumption by region and scenario, Tables A.1 and A.4https://iea.blob.core.windows.net/assets/3179f7f8-01f6-4dd6-bffa-c9f7b73f1dc9/KeyQuestionsonEnergyandAI.pdf
  2. [2]
    International Energy Agency. Energy and AI (April 2025): data centre electricity consumption, Table A.4 (2020) and Chapter 2https://iea.blob.core.windows.net/assets/de9dea13-b07d-42c5-a398-d1b3ae17d866/EnergyandAI.pdf
  3. [3]
    Ember. Yearly electricity data, global release: electricity demand by country (TWh), 2025https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv
  4. [4]
    Central Statistics Office (Ireland). Data Centres Metered Electricity Consumption 2025: Table 1, data centre and total metered electricity consumption, 2015–2025https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/datacentresmeteredelectricityconsumption2025/keyfindings/
  5. [5]
  6. [6]
    Google. Measuring the environmental impact of AI inference (Aug 21, 2025): median Gemini Apps text prompt energy, water and emissionshttps://cloud.google.com/blog/products/infrastructure/measuring-the-environmental-impact-of-ai-inference
  7. [7]
    Google. 2026 Environmental Report: electricity consumption (MWh) and water consumption (million gallons), 2021–2025https://sustainability.google/files/google-2026-environmental-report.pdf
  8. [8]
    Google. 2024 Environmental Report: total electricity consumption (MWh), 2019https://www.gstatic.com/gumdrop/sustainability/google-2024-environmental-report.pdf
  9. [9]
    Google. 2025 Environmental Report: total electricity consumption (MWh), 2020https://www.gstatic.com/gumdrop/sustainability/google-2025-environmental-report.pdf
  10. [10]
    Microsoft. 2026 Environmental Data Fact Sheet: electricity consumption (Table 5) and water consumption (Table 8), FY20–FY25https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf
  11. [11]
    Meta. 2025 Environmental Data Index: total electricity consumption (MWh) and water consumption (megaliters), 2020–2024https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf
  12. [12]
  13. [13]
    Lawrence Berkeley National Laboratory. 2024 United States Data Center Energy Usage Report (Dec 2024): electricity 2023 and 2028 scenarios; direct water consumptionhttps://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf
  14. [14]
    Lawrence Berkeley National Laboratory. United States Data Center Energy Usage Report, 2025 Update (June 2026): 2024 electricity and 2030 scenarioshttps://escholarship.org/content/qt33m6w3x0/qt33m6w3x0.pdf
Cite this graphicData.co. “Data Center Energy Consumption (2020–2035).” Data.co Graphics, updated 2026-11-11. https://data.co/graphics/data-center-energy-consumption