What percentage of U.S. electricity do data centers use?
About 4.7%. Lawrence Berkeley National Laboratory (LBNL) estimates that U.S. data centers used 192 terawatt-hours (TWh) of electricity in 2024, in its June 2026 update for the Department of Energy. That is up from about 76 TWh, or 1.9% of U.S. electricity, in 2018, and about 60 TWh a year in 2014–2016. LBNL's update puts growth at 14% from 2023 to 2024 and expects 22% in 2025 and 29% in 2026.
Ranked as if they were a state (Figure 1), U.S. data centers used more electricity in 2024 than every state except Texas (505.4 TWh of retail sales), Florida (255.1 TWh) and California (245.7 TWh), and more than Ohio, Georgia or Virginia. The Electric Power Research Institute (EPRI), using its own method, estimates 2024 data center use at 177 to 192 TWh.
How much electricity will data centers use by 2030?
649 TWh, or 11.8% of U.S. electricity, in LBNL's 2030 Reference Case, 3.4 times the 2024 level. Its scenarios range from 521 TWh (9.5%) to 843 TWh (15.3%), and its Reference Case passes 464 TWh in 2028 (Figure 3). Against the states' 2024 use, even the low case would rank first, ahead of Texas, although Texas's own sales grew to 533.3 TWh in 2025.
Other forecasts land in a similar range (Figure 2). EPRI's February 2026 report projects 9% to 17% of U.S. electricity by 2030, about 60% higher than its 2024 projections of 4.6% to 9.1%. McKinsey & Company, the source behind Visual Capitalist's chart for Global X, projected 606 TWh, or 11.7%, in 2030, up from 147 TWh (3.7%) in 2023. LBNL's AI servers account for 55% of all data center electricity in its 2030 Reference Case.
Which states use the most electricity for data centers?
By share, Virginia: data centers used 25.59% of the state's electricity in 2023, or 33.9 million megawatt-hours (MWh), according to EPRI (Figure 4). North Dakota (15.42%), Nebraska (11.70%), Iowa (11.43%), Oregon (11.39%) and Wyoming (11.26%) followed. EPRI estimated that 15 states accounted for 80% of U.S. data center load in 2023, with Texas (21.8 million MWh) second to Virginia in volume.
EPRI's 2026 report says Virginia is still the only state where data centers use more than 20% of electricity, and that this share could reach 39% to 57% by 2030. In its Medium scenario, seven more states could pass 20%: Oregon, Iowa, Nebraska, Nevada, Wyoming, Arizona and Indiana.
Are data centers driving U.S. electricity demand growth?
They are the largest single driver. U.S. retail electricity sales rose 205.7 TWh from 2023 to 2025, to 4,079.9 TWh, according to the EIA's Electric Power Annual, and the commercial sector, where most data centers are billed, accounted for 95.2 TWh, or 46%, of that rise (Figure 5). EIA's September 2026 Short-Term Energy Outlook said record consumption was driven by data center development and manufacturing, and expected commercial sales to account for 63% of the increase in 2026.
Texas added 27.8 TWh of retail sales in 2025 and Virginia 9.5 TWh, the two largest gains (Figure 6). EIA reports that Virginia's commercial electricity sales rose by nearly 30.0 million MWh between 2019 and 2025, growth it says is largely driven by a concentration of data centers.
How much power will data centers need by 2030?
Utilities expect U.S. summer peak demand to grow by 166 gigawatts (GW) from 2025 to 2030, and Grid Strategies links roughly 90 GW of that, about 55%, to data centers. The five-year forecast has risen from 24 GW in 2022 to 38 GW in 2023, 64 GW in 2024 and 166 GW in 2025 (Figure 7). Grid Strategies warns the data center portion is likely overstated by roughly 25 GW, since market analysts expect data centers to need not much more than 65 GW through 2030.
LBNL's Reference Case translates to 148 GW of grid interconnection capacity needed for data centers in 2030, assuming 50% average utilization. EPRI estimates data center peak load at 21 to 22 GW in 2024, rising to 45 to 94 GW by 2030.
Methodology & caveats
Data center electricity figures are modeled estimates, not metered data: no U.S. agency measures data center consumption nationally or by state. LBNL builds its estimates bottom-up from server, storage and network shipments, power draw and cooling efficiency, and excludes cryptocurrency mining. Its 2026 update revised past years down because of lower reported GPU shipments; it implies about 168 TWh for 2023, against 176 TWh in the 2024 report, so this graphic does not join the two vintages into one series. The 2014 and 2018 values are LBNL's own rounded figures ('about 60' and 'about 76' TWh). LBNL's 2030 shares divide by NERC's 2025 Long-Term Reliability Assessment forecast; the denominators for its 2018–2024 shares are not stated.
Figure 1 compares LBNL's national data center estimate with EIA retail sales by state, both for 2024. Retail sales exclude on-site generation (direct use, 135.0 TWh nationally in 2024), and data center use is already counted inside each state's sales, so the ladder compares scale rather than separate loads. 2030 rungs are ranked against the states' 2024 use; states' use will also change. Figures 5 and 6 and all growth multiples are calculated by data.co from EIA's final 2025 Electric Power Annual tables. EIA does not break out data centers, which are mostly but not only in the commercial sector, and it flags that some sector shifts since 2023 reflect improved reporting of data centers and crypto mining.
State shares (Figure 4) come from EPRI's May 2024 report, which applied national estimates to state-level data and excluded crypto mining. EPRI's February 2026 report includes crypto mining, uses different data and gives state shares only in a chart, so its values are not plotted; the two editions differ sharply for some states (North Dakota). Forecast shares in Figure 2 use different denominators (U.S. consumption for LBNL, generation for EPRI 2024) and different base years. McKinsey's figures are taken from Visual Capitalist's chart because McKinsey's page blocked automated access; they have not been checked on McKinsey's site. Grid Strategies' peak-demand figures aggregate utility forecasts filed with FERC and are forecasts, not measurements; its split of growth by driver is approximate.
Sources
- [1]Lawrence Berkeley National Laboratory. United States Data Center Energy Usage Report, 2025 Update (June 2026): 2024 estimate, 2028 Reference Case and 2030 scenarios (Table 2)https://escholarship.org/content/qt33m6w3x0/qt33m6w3x0.pdf
- [2]U.S. Energy Information Administration. Electric Power Annual (data for 2025): Table 2.8, Sales of electricity to ultimate customers by end-use sector, by state, 2025 and 2024https://www.eia.gov/electricity/annual/xls/epa_02_08.xlsx
- [3]Lawrence Berkeley National Laboratory. 2024 United States Data Center Energy Usage Report (Dec 2024): U.S. data center electricity use and share, 2014–2023https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf
- [4]Electric Power Research Institute. Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption (May 2024): Table 2 and Table A1, state data center load, 2023https://restservice.epri.com/publicdownload/000000003002028905/0/Product
- [5]Grid Strategies. Power Demand Forecasts Revised Up for Third Year Running, Led by Data Centers (National Load Growth Report, November 2025)https://gridstrategiesllc.com/wp-content/uploads/Grid-Strategies-National-Load-Growth-Report-2025.pdf
- [6]Electric Power Research Institute. Powering Intelligence 2026 (February 2026): U.S. data center electricity projections to 2030https://restservice.epri.com/publicdownload/000000003002034696/0/Product
- [7]McKinsey & Company (via Visual Capitalist). The Rising Share of U.S. Data Center Power Demand, 2023–2030 (Visual Capitalist for Global X, citing McKinsey & Company, 2024)https://www.visualcapitalist.com/sp/gx03-charted-the-rising-share-of-u-s-data-center-power-demand/
- [8]U.S. Energy Information Administration. Electric Power Annual (data for 2025): Table 2.5, Sales of electricity to ultimate customers, total by end-use sector, 2015–2025https://www.eia.gov/electricity/annual/xls/epa_02_05.xlsx
- [9]U.S. Energy Information Administration. Commercial electricity sales have soared in Virginia, driven by data centers (Today in Energy, May 5, 2026)https://www.eia.gov/todayinenergy/detail.php?id=67664