Skip to content
Data.co Marketplace← Data.co for Enterprise
data.coMarketplace
Graphic · Energy · 2018–2030

Data Center Share of U.S. Electricity (2018–2030)

U.S. data centers used 192 TWh of electricity in 2024, 4.7% of the nation's total and more than every state but Texas, Florida and California. The 51st State ranks them as if they were a state: in Lawrence Berkeley National Laboratory's 2030 reference case, they would use more power than Texas does today.

Updated Nov 16, 20267 charts · 4 key stats9 primary sources
Fig. 1

The 51st State

U.S. data centers ranked against the 20 states that use the most electricity, 2024, TWh, on a log scale. Dashed rungs show LBNL's 2030 scenarios for data centers and the rank each would take against the states' 2024 use.

Electricity use, 2024Data centers vs. the top 20 states · TWh1002005002030 high case: 843 TWh → #12030 reference case: 649 TWh → #12030 low case: 521 TWh → #1Texas 505.4 TWhFlorida 255.1 TWhCalifornia 245.7 TWh#4 U.S. data centers · 192 TWhOhio 153.7 TWhGeorgia 150 TWhPennsylvania 142.1 TWhNew York 140.5 TWhVirginia 138 TWhNorth Carolina 136.9 TWhIllinois 133.2 TWhTennessee 103 TWhIndiana 99.2 TWhMichigan 99 TWhLouisiana 95.4 TWhArizona 90.8 TWhWashington 90 TWhAlabama 87.5 TWhSouth Carolina 84 TWhMissouri 77.8 TWhKentucky 74.4 TWh

Data centers: LBNL's modeled estimate of all U.S. data center electricity use, excluding crypto mining. States: EIA retail sales to all sectors, which exclude on-site generation; data center use is already part of each state's total, so this compares scale, not separate loads. Texas's 2025 sales (533.3 TWh) would top LBNL's 2030 low case.

Data center share of U.S. electricity, 2024
4.7%
192 TWh, up from 1.9% (about 76 TWh) in 2018
U.S. data center electricity use in 2030, LBNL reference case
649 TWh
11.8% of U.S. electricity; scenarios range from 9.5% to 15.3%
Share of Virginia's electricity used by data centers, 2023
25.59%
33.9 million MWh, the highest share of any state (EPRI estimate)
Data centers' share of forecast U.S. peak demand growth, 2025–2030
About 55%
Roughly 90 GW of the 166 GW utilities expect to add
Fig. 2

Forecasts put data centers at 4.6% to 17% of U.S. power by 2030

Data center electricity demand forecasts for 2030, share of U.S. electricity, %, by forecaster and scenario, vs. the 2024 estimate

EPRI 2026, high17%LBNL, high15.3%LBNL, reference11.8%McKinsey 202411.7%LBNL, low9.5%EPRI 2024, high9.1%EPRI 2026, low9%2024 (LBNL est.)4.7%EPRI 2024, low4.6%

LBNL rows are its June 2026 update. Shares use each forecaster's own denominator: LBNL divides by NERC's 2030 forecast of U.S. use; EPRI's 2024 report uses U.S. generation; EPRI 2026 gives only a range (its low and high ends); EPRI 2024's high row is its 'higher growth' (15% a year) scenario, its low row the 3.7% scenario. EPRI's newer report is about 60% higher than its 2024 one. McKinsey's figure is via Visual Capitalist's chart.

Fig. 3

U.S. data center power use could more than triple from 2024 to 2030

U.S. data center electricity consumption, TWh: LBNL estimates and 2030 scenarios

LBNL estimateLBNL 2026 scenario
030060090020142018202220262030High case843 TWh in 2030Reference case649 TWh in 2030Low case521 TWh in 20302024 report176 TWh in 2023

The 2026 update revised past years down (it implies about 168 TWh for 2023, vs. 176 TWh in the 2024 report), so the two vintages are drawn as separate series. 2014 is LBNL's 'about 60 TWh' for 2014–2016; 2018 is 'about 76 TWh'. Scenario lines start at the 2024 estimate; LBNL publishes 2028 only for its Reference Case.

Fig. 4

Data centers used a quarter of Virginia's electricity in 2023

Data center electricity use by state, share of each state's electricity consumption, 2023, %, states with the highest shares

Virginia25.59%North Dakota15.42%Nebraska11.70%Iowa11.43%Oregon11.39%Wyoming11.26%Nevada8.69%Utah7.68%Arizona7.43%Washington5.69%Illinois5.48%New Jersey5.42%Texas4.59%

EPRI estimates (not metered), excluding crypto mining, for the 19 states it tabulates. EPRI's 2026 report uses a different method and publishes state shares only in a chart; it says Virginia is still the only state above 20%.

Fig. 5

Commercial customers, including most data centers, drove 46% of new U.S. demand

U.S. electricity demand growth: change in retail electricity sales by end-use sector, 2023 to 2025, TWh (total sales rose 205.7 TWh, to 4,079.9 TWh)

Commercial95.2 TWhResidential69.1 TWhIndustrial40.9 TWhTransportation0.5 TWh

EIA retail sales, final values. Changes and shares calculated by data.co. Most data centers buy power as commercial customers, but EIA does not break them out, and some are billed as industrial. EIA notes that some commercial and industrial changes since 2023 reflect better reporting of data centers and crypto mining.

Fig. 6

Texas and Virginia added the most electricity demand in 2025

Change in retail electricity sales by state, 2024 to 2025, TWh, top 10 states

Texas27.8 TWhVirginia9.5 TWhOhio8.2 TWhIndiana4.3 TWhTennessee4.1 TWhIowa4 TWhFlorida4 TWhNorth Carolina3.5 TWhNew York3.3 TWhGeorgia3.2 TWh

Changes calculated by data.co from EIA retail sales, all sectors. EIA attributes Virginia's commercial growth largely to data centers; other states' growth also reflects population, weather, industry and electrification.

Fig. 7

Utilities' five-year load growth forecast rose nearly sevenfold in three years

Data center power demand forecast in context: forecast growth in U.S. summer peak demand over the next five years, GW, by year the forecasts were filed

0501001502002022202320242025166 GW24 GW

Aggregate of utility forecasts filed with FERC (Form 714), compiled by Grid Strategies. Forecasts, not measured demand. Grid Strategies links about 90 GW of the 2025 figure to data centers and says that portion is likely overstated by roughly 25 GW.

Free to republish

Add This Graphic to Your Website

Paste one snippet and every chart, stat and citation above appears on your page. It stays interactive and responsive, and it updates automatically when we revise the data.

  • All sources travel with every card
  • Resizes to fit any column width
  • Light or dark theme, full set or a single card
  • Free with attribution, which is built in
Share this graphic
<div class="graphic-embed" data-graphic="data-center-share-of-us-electricity">
  <a href="https://data.co/graphics/data-center-share-of-us-electricity">Data Center Share of U.S. Electricity (2018–2030)</a> by Data.co
</div>
<script async src="https://data.co/embed.js"></script>
Auto-resizes to fit its content. Works on WordPress, Webflow, Squarespace, Ghost and plain HTML.
Preview

What percentage of U.S. electricity do data centers use?

About 4.7%. Lawrence Berkeley National Laboratory (LBNL) estimates that U.S. data centers used 192 terawatt-hours (TWh) of electricity in 2024, in its June 2026 update for the Department of Energy. That is up from about 76 TWh, or 1.9% of U.S. electricity, in 2018, and about 60 TWh a year in 2014–2016. LBNL's update puts growth at 14% from 2023 to 2024 and expects 22% in 2025 and 29% in 2026.

Ranked as if they were a state (Figure 1), U.S. data centers used more electricity in 2024 than every state except Texas (505.4 TWh of retail sales), Florida (255.1 TWh) and California (245.7 TWh), and more than Ohio, Georgia or Virginia. The Electric Power Research Institute (EPRI), using its own method, estimates 2024 data center use at 177 to 192 TWh.

How much electricity will data centers use by 2030?

649 TWh, or 11.8% of U.S. electricity, in LBNL's 2030 Reference Case, 3.4 times the 2024 level. Its scenarios range from 521 TWh (9.5%) to 843 TWh (15.3%), and its Reference Case passes 464 TWh in 2028 (Figure 3). Against the states' 2024 use, even the low case would rank first, ahead of Texas, although Texas's own sales grew to 533.3 TWh in 2025.

Other forecasts land in a similar range (Figure 2). EPRI's February 2026 report projects 9% to 17% of U.S. electricity by 2030, about 60% higher than its 2024 projections of 4.6% to 9.1%. McKinsey & Company, the source behind Visual Capitalist's chart for Global X, projected 606 TWh, or 11.7%, in 2030, up from 147 TWh (3.7%) in 2023. LBNL's AI servers account for 55% of all data center electricity in its 2030 Reference Case.

Which states use the most electricity for data centers?

By share, Virginia: data centers used 25.59% of the state's electricity in 2023, or 33.9 million megawatt-hours (MWh), according to EPRI (Figure 4). North Dakota (15.42%), Nebraska (11.70%), Iowa (11.43%), Oregon (11.39%) and Wyoming (11.26%) followed. EPRI estimated that 15 states accounted for 80% of U.S. data center load in 2023, with Texas (21.8 million MWh) second to Virginia in volume.

EPRI's 2026 report says Virginia is still the only state where data centers use more than 20% of electricity, and that this share could reach 39% to 57% by 2030. In its Medium scenario, seven more states could pass 20%: Oregon, Iowa, Nebraska, Nevada, Wyoming, Arizona and Indiana.

Are data centers driving U.S. electricity demand growth?

They are the largest single driver. U.S. retail electricity sales rose 205.7 TWh from 2023 to 2025, to 4,079.9 TWh, according to the EIA's Electric Power Annual, and the commercial sector, where most data centers are billed, accounted for 95.2 TWh, or 46%, of that rise (Figure 5). EIA's September 2026 Short-Term Energy Outlook said record consumption was driven by data center development and manufacturing, and expected commercial sales to account for 63% of the increase in 2026.

Texas added 27.8 TWh of retail sales in 2025 and Virginia 9.5 TWh, the two largest gains (Figure 6). EIA reports that Virginia's commercial electricity sales rose by nearly 30.0 million MWh between 2019 and 2025, growth it says is largely driven by a concentration of data centers.

How much power will data centers need by 2030?

Utilities expect U.S. summer peak demand to grow by 166 gigawatts (GW) from 2025 to 2030, and Grid Strategies links roughly 90 GW of that, about 55%, to data centers. The five-year forecast has risen from 24 GW in 2022 to 38 GW in 2023, 64 GW in 2024 and 166 GW in 2025 (Figure 7). Grid Strategies warns the data center portion is likely overstated by roughly 25 GW, since market analysts expect data centers to need not much more than 65 GW through 2030.

LBNL's Reference Case translates to 148 GW of grid interconnection capacity needed for data centers in 2030, assuming 50% average utilization. EPRI estimates data center peak load at 21 to 22 GW in 2024, rising to 45 to 94 GW by 2030.

Methodology & caveats

Data center electricity figures are modeled estimates, not metered data: no U.S. agency measures data center consumption nationally or by state. LBNL builds its estimates bottom-up from server, storage and network shipments, power draw and cooling efficiency, and excludes cryptocurrency mining. Its 2026 update revised past years down because of lower reported GPU shipments; it implies about 168 TWh for 2023, against 176 TWh in the 2024 report, so this graphic does not join the two vintages into one series. The 2014 and 2018 values are LBNL's own rounded figures ('about 60' and 'about 76' TWh). LBNL's 2030 shares divide by NERC's 2025 Long-Term Reliability Assessment forecast; the denominators for its 2018–2024 shares are not stated.

Figure 1 compares LBNL's national data center estimate with EIA retail sales by state, both for 2024. Retail sales exclude on-site generation (direct use, 135.0 TWh nationally in 2024), and data center use is already counted inside each state's sales, so the ladder compares scale rather than separate loads. 2030 rungs are ranked against the states' 2024 use; states' use will also change. Figures 5 and 6 and all growth multiples are calculated by data.co from EIA's final 2025 Electric Power Annual tables. EIA does not break out data centers, which are mostly but not only in the commercial sector, and it flags that some sector shifts since 2023 reflect improved reporting of data centers and crypto mining.

State shares (Figure 4) come from EPRI's May 2024 report, which applied national estimates to state-level data and excluded crypto mining. EPRI's February 2026 report includes crypto mining, uses different data and gives state shares only in a chart, so its values are not plotted; the two editions differ sharply for some states (North Dakota). Forecast shares in Figure 2 use different denominators (U.S. consumption for LBNL, generation for EPRI 2024) and different base years. McKinsey's figures are taken from Visual Capitalist's chart because McKinsey's page blocked automated access; they have not been checked on McKinsey's site. Grid Strategies' peak-demand figures aggregate utility forecasts filed with FERC and are forecasts, not measurements; its split of growth by driver is approximate.

Sources

  1. [1]
    Lawrence Berkeley National Laboratory. United States Data Center Energy Usage Report, 2025 Update (June 2026): 2024 estimate, 2028 Reference Case and 2030 scenarios (Table 2)https://escholarship.org/content/qt33m6w3x0/qt33m6w3x0.pdf
  2. [2]
    U.S. Energy Information Administration. Electric Power Annual (data for 2025): Table 2.8, Sales of electricity to ultimate customers by end-use sector, by state, 2025 and 2024https://www.eia.gov/electricity/annual/xls/epa_02_08.xlsx
  3. [3]
    Lawrence Berkeley National Laboratory. 2024 United States Data Center Energy Usage Report (Dec 2024): U.S. data center electricity use and share, 2014–2023https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf
  4. [4]
    Electric Power Research Institute. Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption (May 2024): Table 2 and Table A1, state data center load, 2023https://restservice.epri.com/publicdownload/000000003002028905/0/Product
  5. [5]
    Grid Strategies. Power Demand Forecasts Revised Up for Third Year Running, Led by Data Centers (National Load Growth Report, November 2025)https://gridstrategiesllc.com/wp-content/uploads/Grid-Strategies-National-Load-Growth-Report-2025.pdf
  6. [6]
    Electric Power Research Institute. Powering Intelligence 2026 (February 2026): U.S. data center electricity projections to 2030https://restservice.epri.com/publicdownload/000000003002034696/0/Product
  7. [7]
    McKinsey & Company (via Visual Capitalist). The Rising Share of U.S. Data Center Power Demand, 2023–2030 (Visual Capitalist for Global X, citing McKinsey & Company, 2024)https://www.visualcapitalist.com/sp/gx03-charted-the-rising-share-of-u-s-data-center-power-demand/
  8. [8]
    U.S. Energy Information Administration. Electric Power Annual (data for 2025): Table 2.5, Sales of electricity to ultimate customers, total by end-use sector, 2015–2025https://www.eia.gov/electricity/annual/xls/epa_02_05.xlsx
  9. [9]
    U.S. Energy Information Administration. Commercial electricity sales have soared in Virginia, driven by data centers (Today in Energy, May 5, 2026)https://www.eia.gov/todayinenergy/detail.php?id=67664
Cite this graphicData.co. “Data Center Share of U.S. Electricity (2018–2030).” Data.co Graphics, updated 2026-11-16. https://data.co/graphics/data-center-share-of-us-electricity